Laserfiche WebLink
DEPART FAEN 1 OF PUBLIC WORKS <br /> F. For trenchless excavations greater than three feet in depth of cover over the utility <br /> facility, and not requiring a signiricant surface incision greater than industry bore <br /> pit standards. <br /> Exceptions must be requested and submitted in writing to the Depar�"e`l.. Payment Of non- <br /> refundable processing fee is also required. Exceptians will be reviewed using the Department s <br /> Action Approval process, which requires the recommendation of a Deputy Director. <br /> S)SUSA\rlPRDrEDtrRESL411)DRR,�f ND CHANGES a-12-12-DDc PAGE 3 OF 3 REVISED 09-1-2-12 <br /> REVISION NO. 2 <br />