Laserfiche WebLink
California MUTCD 2012 Edition Page 1136 <br /> (FHWA's MUTCD 2009 Edition,as amended for use in California) <br /> 'Table 61-1-4. Formulas for W&lminiing Taper Length <br /> §mg(S) Tiper Lehqth(IL)In feet <br /> an.mphorlessL= WS2 <br /> - <br /> 60 <br /> -49 mph or more L= WS <br /> Where:L =lapef 16riglh in feet <br /> W=Mdih of afriel In loot <br /> S =PWe4.so'q�dff(Kifor6q-peak85th-percentite <br /> spe6'dpT[6?*loiyurkstarilng,orthe aiiricfpated <br /> operdlfng speed id mpli <br /> Table 6H-4(CA).Taper Length Criteria for Temporary Traffic Control Zones <br /> (for 12 feet Offset Width) <br /> Minimum Taper Length** <br /> Speed* for Width of Offset 12 feet(W) <br /> S Merging Shifting Shoulder Down <br /> (mph) L U2 U3 Stream <br /> (feet) feet) LfeetL (feqK!L_ <br /> 20 80 40 27 50 <br /> 25 125 63 42 50 <br /> 30 180 90 60 50 <br /> 35 245 123 82 50 <br /> 40 320 160. 107 50 <br /> 45 540 270 180 50 <br /> 50 600 300 200 50 <br /> 55 660 330 220 50 <br /> 60 720 360 240 50 <br /> 65 780 390 260 50 <br /> 70 840 420 280 50 <br /> Posted speed limit,off-peak 85th-percentile speed prior to work starting,or the anticipated operating <br /> speed in mph. <br /> For other offsets use the following merging taper length formula for L: <br /> For speeds of 40 mph or less,L=WS2160 <br /> For speeds of 45 mph or more,L=WS <br /> Where: L=taper length in feet <br /> W=width of offset in feet <br /> S=posted speed limit,off-peak 85th-percentile speed prior to work <br /> starting,or the anticipated operating speed in mph <br /> Maximum downstream taper length is 100 feet. See Section 6C.08. <br /> Chapter 6H—Typical Applications January 13,2012 <br /> Part 6—Temporary Traffic Control <br /> Temporary Traffic Control(Parts 1 &6)Page 194 of 320 <br />