My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2015_PS-1500000 thru PS-1500500_ - PS-1500345
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2015
>
PS-1500000 thru PS-1500500
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2015_PS-1500000 thru PS-1500500_ - PS-1500345
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 4:32:41 PM
Creation date
12/31/2015 2:37:17 PM
Metadata
Fields
Template:
Permits_Development
DocName
PS-1500345
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2015\PS-1500000 thru PS-1500500
Year2
2015
Supplemental fields
Applicant
PACIFIC GAS & ELECTRIC - STOCKTON
Contracts
CrossReference
PWP730052
Date Entered
2/12/2015
Description
ENCROACHMENT PERMIT
DocCategory
Permit Applications (PA)
Notes
Owners
Parcel Address
S/S FLORIDA AVE 133' W/S MYRAN AVE
Primary Parcel
Type (2)
PS-1500345
Tags
Permits_Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
See Note 1 Below <br /> 6" Min- <br /> 6" I� rF <br /> E%cisiing <br /> 6 I I - avemen i f -6" �_-6" Min <br /> :. <br /> \ \� See Note 2 Below \\ \ <br /> 3 -0` \\ Compact in 12" max 3'-0" <br /> \\ layers to a min relative \i <br /> �\ _______ \ compaction of 95% � _----_ ��-- <br /> ---- - \� under pavement and \- -- \ Var- <br /> Var 90� out pavement. <br /> DO - -Compaq in 24" max OD " <br /> \r layers to1a min relative �\ O \\ 12 <br /> OD/2 {\� \\ compaction o� 85%. r <br /> 4 Compact in 6" layers <br /> to a min relative <br /> compaction of 90%. <br /> 10" Min OD - -10" Min 10" Min OD— —10 <br /> Min. <br /> OD <br /> �+ 20" Min OD <br /> 20 Min <br /> RIGID CONQUIT I FLEXIBLE CONQUI T <br /> NOTEa.- <br /> 1. New pavement shall be 1 " -thicker than existing pavement, minimum. <br /> of 0-25 - Ft. 'New base shall be 1" thicker than existing base, min of 0.50 Ft, <br /> 2. Select native material or imported granular material as approved by the Director <br /> of Public Works. Backfill with materials equal to or better than the existing <br /> pavement and base in quality. <br /> 3: Relative compaction of materials shall be tested in accordance with <br /> the State of California, Dept, of Transportation Testing Manuals, .test <br /> method No. California 216 or 231. <br /> 4. All existing pavement shall be. neatly cut to Line prior to trench excavation. <br /> 5. Jetting or ponding will be permitted within the street right-of-way with <br /> a 3 year bond, when approved by the Director of Public Works. <br /> 6. When shown by soil composition and compactability, ninety percent (90%) <br /> compaction may be used, when approved by the Director of Public Works. <br /> 7. Special bedding and backfill requirements may be shown on the plans or <br /> specified in the special provisions. <br /> r <br /> a� I Approved by: <br /> IPCAL TRENCH BACKFILL �� <br /> No. Revision Descri tion Date <br /> j <br /> �.;3 <br /> CO� T Y Off` SAN ��� <br /> `_1 DEPARTMENT OF PUBLIC WORKS <br /> o for YOU <br /> Date: DEC.2014 S'td. Dwg. No. �o�� <br />
The URL can be used to link to this page
Your browser does not support the video tag.