My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2015_PS-1500000 thru PS-1500500_ - PS-1500362
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2015
>
PS-1500000 thru PS-1500500
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2015_PS-1500000 thru PS-1500500_ - PS-1500362
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 4:32:42 PM
Creation date
12/31/2015 2:37:28 PM
Metadata
Fields
Template:
Permits_Development
DocName
PS-1500362
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2015\PS-1500000 thru PS-1500500
Year2
2015
Supplemental fields
Applicant
PACIFIC GAS & ELECTIC - SAN RAMON
Contracts
CrossReference
PWP7110005
Date Entered
2/17/2015
Description
ENCROACHMENT PERMIT
DocCategory
Permit Applications (PA)
Notes
Owners
Parcel Address
ROTH RD 2200' WWO AIRPORT WY
Primary Parcel
Type (2)
PS-1500362
Tags
Permits_Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Special Conditions for -3- <br /> ENCROACHMENT PERMIT <br /> 25. In addition to standard dust control measures, streets shall be maintained in a clean condition, <br /> free of dirt, mud and debris during construction activities. The contractor shall provide daily, or as <br /> needed, street sweeping using a modern mechanical or vacuum-assisted street sweeper. <br /> 26. The contractor shall not conduct construction operations in rain or heavy fog conditions. <br /> 27. Work shall not proceed until 10 day look ahead weather forecast does not indicate inclement <br /> weather. <br /> 28. Initial patch shall be completed with Hot Mix Asphalt. <br /> 29. Final restoration shall conform to trench cut policy and be performed when acceptable weather <br /> permits. <br /> 30. Contractor is responsible for maintaining temporary patch. <br /> 31. Traffic Control per MUTCD. <br />
The URL can be used to link to this page
Your browser does not support the video tag.