Laserfiche WebLink
Special Conditions for -3- <br /> ENCROACHMENT PERMIT <br /> 25. In addition to standard dust control measures, streets shall be maintained in a clean condition, <br /> free of dirt, mud and debris during construction activities. The contractor shall provide daily, or as <br /> needed, street sweeping using a modern mechanical or vacuum-assisted street sweeper. <br /> 26. The contractor shall not conduct construction operations in rain or heavy fog conditions. <br /> 27. Work shall not proceed until 10 day look ahead weather forecast does not indicate inclement <br /> weather. <br /> 28. Initial patch shall be completed with Hot Mix Asphalt. <br /> 29. Final restoration shall conform to trench cut policy and be performed when acceptable weather <br /> permits. <br /> 30. Contractor is responsible for maintaining temporary patch. <br /> 31. Traffic Control per MUTCD. <br />