Laserfiche WebLink
NOTES.. . <br /> EXHIBIT 2 <br /> 9. ff the distance between cross—cuts are lessLhar,< 9 5G, the entire area <br /> between cross—cuts shall be planed and resurfaced wM 0"ns of <br /> A�phalt Concrete. <br /> 2.. The resurfacing requirements shall .be in addition to County Standard <br /> Drawing No.' R-29. <br /> 3. - Resurfacing for Bell Boles shuil meet these requirements. if excavation occurs <br /> within the shoulder or lane, only that area eh®ll be resurfaced as shown. <br /> 4. if cross—cutting is performed on Local Roads at intervals less then g,5Q' a <br /> Seal Coot for that half of the roadway containing the trench can be used in <br /> lieu of resurfacing. Section 3910,3 (B-2). <br /> _ - r <br /> n C <br /> O <br /> � } C <br /> Paved Shoulder-- �� x m <br /> Q0'4- <br /> p . <br /> ED <br /> m _ <br /> z� <br /> CDI <br /> W <br /> o <br /> 4 � . <br /> I 1E <br /> Fo <br /> CWTIM0 OF <br /> COUNTY ROADWAYS <br /> Mon <br /> Dab <br /> �.� � Q[MV COUIYr <br /> �`` `` C ry by:Mo Data: 3/24/1 - <br />