Laserfiche WebLink
EXHIBIT 2 <br /> I. If the distai7ce between cross—(_--64L3 -are less Eher< 150' the .-entire area . <br /> between cross—cuts shall be planed and resurfaced wHh Gne (1) i .17 of <br /> A#halt Concrete. <br /> 2. The resurfacing requirements shall .be in addition to C6unty Sitandard <br /> Drawing No.-R—Z9. <br /> 3. - resurfacing for Bell boles ah,3l•C njeet these requirerner<ts, if e*ca�€atior� occurs <br /> within the shoulder or lane, ordy that area _hall be resturfaced as shown. <br /> �. if cross®cutti,�g is performed on Local Roods at intervals less then 15D! a <br /> Seal Coat for that half off the roadway oontainirrg the trench- can lie used in <br /> Lieu of resurfacing. SecUon 3990.,3 (Bm2), <br /> ED <br /> . r <br /> II <br /> n m <br /> O <br /> • _ Ufy II -- <br /> Poved ShouldeLJ -X m Q <br /> O U'4— <br /> Li <br /> C::) - <br /> . i <br /> (D F I <br /> OI <br /> Z i � <br /> ID <br /> CDJ E <br /> C. <br /> _ O <br /> LD <br /> _ Fo <br /> - - CROSS CUTTING OF VPb <br /> • 4 <br /> CQU"I ROADWAYS <br /> COUNk <br /> e s <br /> DE �= 1 OFt�II33 C WOP3S k k <br /> 24f 12 <br />