Laserfiche WebLink
California MUTCD 2012 Edition Page 1136 <br /> (FHWA's MUTCD 2009 Edition,as amended for use in California) <br /> Table 6H-4. Formulas#or ID06f0iirtingTaper L-64th <br /> Speed(5) Taper Length(L)In feet <br /> Ah rbQ0 or less L_ YJS' <br /> . 60. <br /> 45 mph or more L= NCS <br /> Where;L =fapeP Ieqil 16 reel <br /> W=yvidih of of(W IA feet <br /> S pDst`sd spE@d Iftnil,qr oh-peak 85th perceNlle <br /> 51300 pj(or(o{M. starling,of the anticrpa(ed <br /> oQeralirig speed j(1 iripii <br /> Table 6H-4(CA).Taper Length Criteria for Temporary Traffic Control Zones <br /> (for 12 feet Offset Width) <br /> Minimum Taper Length** <br /> Speed* for Width of Offset 12 feet(W) <br /> S Merging Shifting Shoulder Down <br /> (mph) L L/2 L/3 Stream <br /> feet feet feet feet**� <br /> 20 80 40 27 50 <br /> 25 125 63 42 50 <br /> 30 180 90 60 50 <br /> 35 245 123 82 50 <br /> 40 320 160- 107 50 <br /> 45 540 - 270 180 50 <br /> 50 600 300 200 50 <br /> 55 660 330 220 50 <br /> 60 720 360 240 50 <br /> 65 780 390 260 50 <br /> 70' 840 420 280 50 <br /> *-Posted speed limit,off-peak 85u,-percentile speed prior to work starting,or the anticipated operating <br /> speed in mph. <br /> **-For other offsets use the following merging taper length formula for L: <br /> For speeds of 40 mph or less,L=WS2/60 <br /> For speeds of 45 mph or more,L=WS <br /> Where: L=taper length in feet <br /> W=width of offset in feet <br /> S=posted speed limit,off-peak 85th-percentile speed prior to work <br /> starting,or the anticipated operating speed in mph <br /> ***-Maximum downstream taper length is 100 feet.See Section 6C.08. <br /> Chapter 6H—Typical Applications <br /> Part 6—Temporary Traffic Control January 13,2012 <br /> Temporary Traffic Control(Parts 1 &6)Page 194 of 320 <br />