Laserfiche WebLink
SPECIAL PROVISIONS <br /> Winter Weather Utility Work <br /> 1. SUPERVISION: The utility company(permittee) shall furnish full-time supervision of all work to inure <br /> compliance with the permit provision. <br /> 2. START OF WORK: No work within the County.right-o:r way shall be started until the utility company - <br /> representative has made an evaluation of weather conditions and has determined the work can be <br /> accomplished under the provisions of the permit. <br /> 3. CLEAN PAVEMENT: Dirt and mud shall not be deposited on the pavement outside the area of work, <br /> and if inadvertently tracked onto the road travel wayshall be removed immediately. <br /> 4. DAILY RESTORATION: Private drivewaysand road intersections shall be restored daily. <br /> 5. WEATHER-TIGHT CONDITIONS: . All tr..enches shall be filled and compacted, ditches and other <br /> drainage facilities regarded and opened, and the entire work area restored to weather-tight condition prior to <br /> any rain. <br /> `APERMTS COUNTER\general provisions\Winter Weather Provisions.docx <br />