Laserfiche WebLink
NOTES: <br /> 1. If the distance between cross—cuts are less then 150' the entire area between <br /> corss—cuts shall be planed and resurfaced with one (1) inch of Asphalt Concrete. <br /> 2. The resurfacing requirements shall be in addition to County Standard Drawing No. <br /> R-29. <br /> 3. Resurfacing for Bell Holes shall meet these; requirements. If excavation occurs within <br /> the shoulder or lane, only that area shall be resufaced as shown. <br /> 4. If cross—cutting is performed on Local Roads at intervals less then 150' a Seal <br /> Coat for that half of the roadway containing the trench can be used in lieu of <br /> resurfacing. Section 2-5.03B-2. <br /> C O <br /> ..(D <br /> (D L <br /> � cU <br /> O <br /> M-C o <br /> '3 a- <br /> c� (D Q <br /> Paved Shoulder o,� <br /> o <br /> O <br /> �T <br /> 1 <br /> O <br /> i <br /> 1 <br /> 1 <br /> Zi I i <br /> N <br /> V) 1 W <br /> T i I i <br /> �1 <br /> ■ <br /> T- J <br /> O 4--U <br /> O <br /> E O <br /> 1 <br /> TRENCH CUTTING POLICY Approved by: <br /> !► CROSS CUTTING OF >� � <br /> COUNTY ROADWAYS No. Revision Description Date <br /> COUNTY OF SAN JOAQUIN <br /> DEPARTMENT OF PUBLIC WORKS q <br /> warkfts for YOU Date: DEC 2014 Std. Dwg. No. R�36 <br />