Laserfiche WebLink
NOTES: <br /> 1. If the distance between cross—cuts are less then 150' the entire area between <br /> corss—cuts shall be planed and resurfaced with one (1) inch of Asphalt Concrete. <br /> 2. The resurfacing requirements shall be in addition to County Standard Drawing No. <br /> R-29. <br /> 3. Resurfacing for Bell Holes shall meet these requirements. If excavation occurs within <br /> the shoulder or lane, only that area shall be resufaced as shown. <br /> 4. If cross—cutting is performed on Local Roads at intervals less then 150' a Seal <br /> Coat for that half of the roadway containing the trench can be used in lieu of <br /> resurfacing. Section 2-5.03E-2. <br /> -v <br /> C a) <br /> o +, <br /> (D <br /> L <br /> VCU <br /> p C <br /> 3CU <br /> N O <br /> C._.0 <br /> (::NJ N3 � <br /> Paved Shoulder °'Q <br /> X <br /> N� O <br /> C <br /> i i C N V <br /> .0 <br /> 1 <br /> O <br /> T� <br /> 1 <br /> O <br /> 1 <br /> I <br /> Cl) <br /> +, <br /> Z 1 <br /> N <br /> (n I W <br /> T i I i <br /> 4 <br /> O_ <br /> T � _W <br /> O_ <br /> t O U <br /> N <br /> O <br /> • TRENCH CUTTING POLICY Approved by: <br /> VV1f It4%ZCROSS CUTTING OF < <br /> COUNTY ROADWAYS No. Revision Description Date <br /> COUNTY OF SAN JOAQUIN <br /> Worldng DEPARTMENT OF PUBLIC WORKS <br /> Worldn+ � YOU Date: DEC 2014 Std. Dwg. No. R-36 <br />