Laserfiche WebLink
NOTES: <br /> 1. If the distance between cross—cuts are less then 150' the entire area between <br /> corss—cuts shall be planed and resurfaced with one (1) inch of Asphalt Concrete. <br /> 2. The resurfacing requirements shall be in addition to County Standard Drawing No. <br /> R-29. <br /> 3. Resurfacing for Bell Holes shall meet these requirements. If excavation occurs within <br /> the shoulder or lane, only that area shall be resufaced as shown. <br /> 4. If cross—cutting is performed on Local Roads at intervals less then 150' a Seal <br /> Coat for that half of the roadway containing the trench can be used in lieu of <br /> resurfacing. Section 2-5.03E-2. <br /> a <br /> C O <br /> v +, <br /> CD <br /> �� L <br /> U�U <br /> v � <br /> :3cU <br /> rn O <br /> rn_rZ v <br /> C•—t <br /> 3 Paved Shoulder <br /> iU) <br /> a Q <br /> v'0 <br /> v� o <br /> C :3t <br /> W O N U <br /> T_ <br /> O <br /> T <br /> O <br /> 1 <br /> 41 <br /> zi <br /> N <br /> U) 1 W <br /> T <br /> w� <br /> O_ <br /> L 1 <br /> O � <br /> 04--C) <br /> co <br /> cn <br /> E O <br /> JU <br /> • TRENCH CUTTING POLICY Approved by: <br /> CROSS CUTTING OFoaq.LN% < >� <br /> COUNTY ROADWAYS No. Revision Description Date <br /> 'Au6 COUNTY OF SAN JOAQUIN <br /> DEPARTMENT OF PUBLIC WORKS <br /> Working, fot YOU Date: DEC 2014 Std. Dwg. No. R-36 <br />