Laserfiche WebLink
NOTES: <br /> 1. If the distance between cross—cuts are less then 150' the entire area between <br /> corss—cuts shall be planed and resurfaced with one (1) inch of Asphalt Concrete. <br /> 2. The resurfacing requirements shall be in addition to County Standard Drawing No. <br /> R-29. <br /> 3. Resurfacing for Bell Holes shall meet these requirements. If excavation occurs within <br /> the shoulder or lane, only that area shall be resufaced as shown. <br /> 4. If cross—cutting is performed on Local Roads at intervals less then 150' a Seal <br /> Coat for that half of the roadway containing the trench can be used in lieu of <br /> resurfacing. Section 2-5.03B-2. <br /> -o <br /> C <br /> o +, <br /> Q <br /> Uv C <br /> � <br /> CU <br /> O O <br /> p,-r-o <br /> n3uni <br /> Paved Shoulder—raw i (D L Q <br /> a <br /> C :3_r <br /> I O O U <br /> W <br /> I <br /> O <br /> T_ <br /> +O <br /> L <br /> I I <br /> 1 <br /> 1 <br /> ZI <br /> N <br /> (nl 1 I W <br /> T I I I <br /> w� <br /> O_ <br /> A <br /> O <br /> J � <br /> r- <br /> 4-- <br /> 0 <br /> L L, to <br /> , <br /> N <br /> E O <br /> I �U <br /> 1 <br /> • j�j► TRENCH CUTTING POLICY Approved by: <br /> CUTTING F <br /> CROSS CU G 0 <br /> COUNTY ROADWAYS No. Revision Description Date <br /> COUNTY OF SAN JOAQ UIN <br /> DEPARTMENT OF PUBLIC WORKS <br /> Working for YOUDate: DEC 2014 Std. Dwg. No. R-36 <br />