My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2015_PS-1500501 thru PS-1501000_ - PS-1500818
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2015
>
PS-1500501 thru PS-1501000
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2015_PS-1500501 thru PS-1501000_ - PS-1500818
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 4:33:48 PM
Creation date
12/31/2015 3:15:29 PM
Metadata
Fields
Template:
Permits_Development
DocName
PS-1500818
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2015\PS-1500501 thru PS-1501000
Year2
2015
Supplemental fields
Applicant
DIEDE CONSTRUCTION
Contracts
CrossReference
PWP7110005
Date Entered
4/7/2015
Description
ENCROACHMENT PERMIT
DocCategory
Permit Applications (PA)
Notes
INSTALLATION OF A NEW FIRE HYDRANT.
Owners
Parcel Address
N/S OF VALPICO RD. 3,000' E/O LAMMERS RD.
Primary Parcel
Type (2)
PS-1500818
Tags
Permits_Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
NOTES: <br /> 1. If the distance between cross—cuts are less; then 150' the entire area between <br /> corss—cuts shall be planed and resurfaced with one (1) inch of Asphalt Concrete. <br /> 2. The resurfacing requirements shall be in addition to County Standard Drawing No. <br /> R-29. <br /> 3. Resurfacing for Bell Holes shall meet these requirements. If excavation occurs within <br /> the shoulder or lane, only that area shall be resufaced as shown. <br /> 4. If cross—cutting is performed on Local Roads at intervals less then 150' a Seal <br /> Coat for that half of the roadway containing the trench can be used in lieu of <br /> resurfacing. Section 2-5.03B-2. <br /> C O <br /> v +, <br /> U�U <br /> v � <br /> =3 CU <br /> to O <br /> rn-(-- 0 <br /> ) 3 <br /> Paved Shoulder—r►1 i x v Q <br /> o0 <br /> o <br /> C :3,C <br /> W I I v2 U <br /> O <br /> O <br /> r <br /> 1 I <br /> �I I <br /> (V I 1 <br /> ZI 1 <br /> NI <br /> V) I I w <br /> O <br /> EJ <br /> 4 t+ <br /> O � :3 <br /> O <br /> O <br /> I I J U <br /> 1 <br /> TRENCH CUTTING POLICY Approved by: <br /> CROSS CUTTING OF <7,-r� `y aW_ <br /> COUNTY ROADWAYS No. Revision Description Date <br /> �► COUNTY OF SAN JOAQUIN <br /> DEPARTMENT OF PUBLIC:WORKS <br /> Working for YOU Date: DEC 2014 Std. Dwg. No. R-36 <br />
The URL can be used to link to this page
Your browser does not support the video tag.