Laserfiche WebLink
NOTES: <br /> 1: If the distance between cross—cuts are less then 150' the entire area between <br /> corss—cuts shall be planed and resurfaced- with one (1) inch of Asphalt Concrete. <br /> 2. The resurfacing requirements shall be in addition to County Standard Drawing No. <br /> R-29. <br /> 3. R-esurfacing for Bell Holes shall meet these requirements. If excavation occurs within <br /> the shoulder or lane', only that area shall be r-esufaced as shown. <br /> 4. If cross—cutting is performed on Local Roads at intervals less then 150' a Seal <br /> Coat for that half of the roadway containing the trench can be used._ in lieu of <br /> resurfacing. Section 2-5.03B-2. <br /> v <br /> c � <br /> v +, <br /> �.(D <br /> U�U <br /> c0 — <br /> O O <br /> M-C 0 <br /> O to <br /> Paved Shoulder Q)a <br /> 00 <br /> d I I 6 O U <br /> W I a- C <br /> O <br /> T <br /> O <br /> i� <br /> L <br /> I <br /> r <br /> :e4I I <br /> 41 <br /> ZI I <br /> U) I I Ld <br /> � W <br /> O <br /> # J H+ <br /> O O <br /> O <br /> � O <br /> L <br /> TRENCH CUTTING POLICY Approved by: <br /> CROSS CUTTING OF <br /> COUNTY ROADWAYS No. Revision Description Date <br /> Ui COUNTY OF SAN JOA <br /> QUI1V <br /> DEPARTMENT OF PUBLIC WORKS <br /> Working fot YOU Date: DEC 2014 Std. Dwg. No. R-36 <br />