My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2015_PS-1500501 thru PS-1501000_ - PS-1500982
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2015
>
PS-1500501 thru PS-1501000
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2015_PS-1500501 thru PS-1501000_ - PS-1500982
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 4:34:38 PM
Creation date
12/31/2015 5:17:49 PM
Metadata
Fields
Template:
Permits_Development
DocName
PS-1500982
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2015\PS-1500501 thru PS-1501000
Year2
2015
Supplemental fields
Applicant
Contracts
CrossReference
PWP7110005
Date Entered
7/27/2015
Description
PS-1500982
DocCategory
Permit Applications (PA)
Notes
Owners
Parcel Address
BOTH SIDES OF BANTA ROAD 900' NORTH OF LINNE ROAD
Primary Parcel
Type (2)
Encroachment Permit (EP)
Tags
Permits_Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Special Conditions for -2- <br /> ENCROACHMENT PERMIT <br /> 12. County roads shall be kept clean from mud and debris at all times along the access points and <br /> work zone areas during entire project. All standard roadway striping and signage shall be clearly <br /> visible, maintained and restored throughout the construction zone during and after the project. <br /> 13. In addition to standard dust control measures, streets shall be maintained in a clean condition, <br /> free of dirt, mud and debris during construction activities. The contractor shall provide daily, or as <br /> needed, street sweeping using a modern mechanical or vacuum-assisted street sweeper. <br /> 14. The contractor shall not conduct construction operations in rain or heavy fog conditions. <br /> 15. Contractor shall establish existing roadway and drainage grades within the construction area. <br /> Any repair to roadways and adjacent areas shall match existing grades. Any proposed grade <br /> changes shall receive prior approval from County. <br /> 16. Any drainage ditches disturbed by construction shall be fully restored. It is the responsibility of the <br /> applicant to ensure existing drainage channels/ditches convey drainage during and after <br /> construction and match pre-construction conditions. <br /> 17. Contractor shall ensure that both exposed ends of the pipe extend beyond the County right-of- <br /> way- <br /> 18. Applicant is required to enter into an agreement with San Joaquin County Public Works providing <br /> for maintenances of the section above the pipeline. The obligations and covenants contained with <br /> the agreement shall run with the land. <br />
The URL can be used to link to this page
Your browser does not support the video tag.