My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2015_PS-1501001 thru PS-1501500_ - PS-1501019
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2015
>
PS-1501001 thru PS-1501500
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2015_PS-1501001 thru PS-1501500_ - PS-1501019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 4:34:48 PM
Creation date
12/31/2015 3:36:14 PM
Metadata
Fields
Template:
Permits_Development
DocName
PS-1501019
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2015\PS-1501001 thru PS-1501500
Year2
2015
Supplemental fields
Applicant
WOLVERINE SERVICES
Contracts
CrossReference
PWP7110005
Date Entered
4/23/2015
Description
ENCROACHMENT PERMIT
DocCategory
Permit Applications (PA)
Notes
Owners
Parcel Address
E/S CHRISMAN RD 20' S/O SCHULTE RD
Primary Parcel
Type (2)
PS-1501019
Tags
Permits_Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
DEFENSE DISTRIBUTION CENTER <br /> FACILITIES ENGINEERING <br /> DEFENSE DEPOT, TRACY, CA. <br /> DOC#: 40263534-15 <br /> Date: 29 January 2015 <br /> Subject: Demolition of Guard Rail Outside the Perimeter Fence <br /> Location: Tracy Site, Outside Perimeter Fence at Northwest Corner of Base <br /> Prepared by: Michael Imbrunetti <br /> STATEMENT OF WORK <br /> Contractor is to furnish all labor, material, transportation, supplies and supervision <br /> necessary to demolish and remove the guard rail outside the perimeter fence at the <br /> Northwest corner of the base. Scope of work includes, but is not limited to, the <br /> following: <br /> Note: The guard rail shall be removed only atter the relocation of the PG&E utility pole <br /> located in the immediate area. The relocation of the utility pole is currently scheduled <br /> for 22 February 2015. <br /> 1.0 Before Commencing Construction the Contractor Shall Obtain all required <br /> Permits and Permissions from the County of San Joaquin <br /> 1.1 See enclosed documents <br /> 2.0 Demolish and Remove the Guard Rail <br /> 2.1 Disassemble and remove guard rail sections <br /> 2.2 Remove posts <br /> 2.2.1 Backfill any holes remaining after removal of posts <br /> 2.3 Disassemble any other guard rail material <br /> 2.4 Remove all material from the job site <br /> 2.4.1 The contractor shell confer with Wolverine Services and/or the CGA <br /> Contracting Officer Representative to determine if either desires to <br /> keep useable material for future use on site <br /> 2.4.1.1 The contractor shall provide any or all material desired to <br /> Wolverine services <br /> 2.4.1.2 If the material is not desired the contractor shall properly <br /> remove all material from the site <br /> 3.0 Provide any other material and/or perform any other labor necessary to ensure the <br /> guard rail is fully removed and the area is left in a relatively smooth condition. <br /> 4.0 Any work outside this scope shall be approved in advance by the Engineering <br /> Technician or (if work is performed by WOLVERINE Services) the CGA Contracting <br /> Officer Representative. <br /> Page 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.