Laserfiche WebLink
NOTES: <br /> 1. If the distance between cross—cuts are less then 150' the entire area between <br /> corss—cuts shall be planed and resurfaced with one (1) inch of Asphalt Concrete. <br /> 2. The resurfacing requirements shall be in addition to County Standard Drawing No. <br /> R-29. <br /> 3. Resurfacing for Bell Holes shall meet these requirements. If excavation occurs within <br /> the shoulder or lane, only that area shall be resufaced as shown. I <br /> 4. If cross—cutting is performed on Local Roads at intervals less then 150' a Seal <br /> Coat for that half of the roadway containing the trench can be used in lieu of I <br /> resurfacing. Section 2-5.03B-2. <br /> c � <br /> II +, <br /> �U <br /> �� L <br /> U�U <br /> 8 C <br /> � �U <br /> U) 41 <br /> o <br /> rn-C 0 <br /> +� Q- <br /> Paved Shoulder-- i 0 Q <br /> a0 <br /> C: z3_F <br /> IL W EL <br /> II N U <br /> O <br /> L <br /> O_ <br /> _I 1 <br /> I <br /> O <br /> Z� 1 <br /> N <br /> 01 <br /> Cn 1 W <br /> O_ <br /> J-Fr <br /> O II <br /> 4-0 <br /> O <br /> +, U) <br /> N <br /> E O <br /> L <br /> i 1 i JU <br /> TRENCH CUTTING POLICY Approved by: <br /> CROSS CUTTING OF r, /�l. A�-, <br /> COUNTY ROADWAYS No. Revision Description Date <br /> +�► COUNTY OF SAN J <br /> OAQUIN <br /> DEPARTMENT OF PUBLIC WORKS <br /> WOrUng for YOU Date: DEC 2014 Std. Dwg. No. R-36 <br />