Laserfiche WebLink
California MUTCD 2014 Edition Page 1137 <br /> (FHWA's MUTCD 2009 Edition,including Revisions I &2,as amended for use in California) <br /> Table 611 4(CA),Taper Length Criteria for Temporary Traffic Control Zones <br /> (for 12 feet Offset Width) <br /> Minimum Taper Length** <br /> Speed* for Width of Offset 12 feet(W) <br /> S Merging Shifting Shoulder Down <br /> (mph) L Ll2 Ll3 Stream <br /> feet feet feet <br /> (feet)*** <br /> 20 80 40 27 50 <br /> 25 125 63 42 50 <br /> 30 _ 180 90 60 50 <br /> 35 245 123 82 50 <br /> 40 320 160 107 50 <br /> 45 540 270 180 50 <br /> 50 600 300 <br /> 55 660 330 220 50 <br /> 60 720 360 240 50 <br /> 65 780 390 260 50 _ <br /> 70 840 420 280 50 <br /> 75 ----- 900 450 _ ----..._.300 T — 50 ---- <br /> * Posted speed limit, off-peak 85"-percentile speed prior to uvork starting, or the anticipated operating <br /> speed in mph. <br /> For other offsets use the following merging taper length formula for L: <br /> For speeds of 40 mph or less, L=WS2/60 <br /> For speeds of 45 mph or more, L=WS <br /> Where: L =taper length in feet <br /> W=width of offset in feet <br /> S =posted speed limit,off-peak 8,511-percentile speed prior to work <br /> starting,or the anticipated operating speed in mph <br /> *`*-Maximum downstream taper length is 100 feet. See Section 6C.08. <br /> Chapter 6H—Typical Applications November 7,2014 <br /> Part 6—Temporary Traffic Control <br />