Laserfiche WebLink
NOTES: <br /> 1. If the distance between cross—cuts are less then 150' the entire area between <br /> corss—cuts shall be planed and resurfaced with one (1) inch of Asphalt Concrete. <br /> 2. The resurfacing requirements shall be in addition to County Standard Drawing No. <br /> R-29. <br /> 3. Resurfacing for Bell Holes shall meet these requirements. If excavation occurs within <br /> the shoulder or lane, only that area shall be resufaced as shown. <br /> 4. If cross—cutting is performed on Local Roads at intervals less then 150' a Seal <br /> Coat for that half of the roadway containing the trench can be used in lieu of <br /> resurfacing. Section 2-5.03B-2. <br /> -o <br /> c O <br /> �� L <br /> 0 <br /> cU <br /> O O <br /> p�� o <br /> C;t <br /> :}, 3 <br /> Paved Shoulder <br /> a 4-- <br /> 0 <br /> c �-C <br /> a , av) u <br /> w �.c <br /> T_ <br /> C3_ <br /> L <br /> T_ <br /> CD_ <br /> � I � <br /> a� <br /> i <br /> 01 <br /> ail I <br /> ' w <br /> i I � <br /> o_ <br /> L J <br /> CD � 3 <br /> 0U <br /> L <br /> O <br /> O <br /> 1 <br /> r TRENCH CUTTING POLICY Approved by: <br /> CROSS CUTTING OF `yam <br /> COUNTY ROADWAYS No. Revision Description Date <br /> �tn COUNTY OF SAN JOAQUIN <br /> Working for DEPARTMENT OF PUBLIC WORKS <br /> YOU Date: DEC 2014 Std. Dwg. No. R-36 <br />