Laserfiche WebLink
NOTES: <br /> 1. If the distance between cross—cuts are less then 150' the entire area between <br /> corss—cuts shall be planed and resurfaced with one (1) inch of Asphalt Concrete. <br /> 2. The resurfacing requirements shall be in addition to County Standard Drawing No. <br /> R-29. <br /> 3. Resurfacing for Bell Holes shall meet these requirements. If excavation occurs within <br /> the shoulder or lane, only that area shall be resufaced as shown. <br /> 4. If cross—cutting is performed on Local Roads at intervals less then 150' a Seal <br /> Coat for that half of the roadway containing the trench can be used in lieu of <br /> resurfacing. Section 2-5.03B-2. <br /> .0 <br /> C o <br /> v +, <br /> a� <br /> U�U <br /> v c <br /> :3cU <br /> rn O <br /> rn-C v <br /> c•—s <br /> 0i N U) <br /> Paved Shoulder--in I x Q <br /> a) a`-- <br /> a)I: o <br /> C :3-C <br /> W I I N U <br /> .0 <br /> T <br /> L <br /> 0 <br /> 1 I <br /> � 1 <br /> -N <br /> ZI <br /> 1 <br /> 01 I a- <br /> 1 W <br /> 1 I I <br /> 41 <br /> O <br /> 1 <br /> � =3 <br /> `+-U <br /> O <br /> V) <br /> U) <br /> o <br /> I I JU <br /> 1 <br /> TRENCH CUTTING POLICY Approved by: <br /> CROSS CUTTING OF <:y rx <br /> . <br /> COUNTY ROADWAYS No. Revision Description Date <br /> to COUNTY OF SAN JOAQUIN <br /> DEPARTMENT OF PUBLIC WORKS <br /> 'Working for YOU 4 Std. Dwg. No. <br /> Date: DEC 20 R-SG <br />