Laserfiche WebLink
e ' <br /> NOTES: <br /> 1. If the distance between cross—cuts are less then 150' the entire area between <br /> corss—cuts shall be planed and resurfaced with one (1) inch of Asphalt Concrete. <br /> 2. The resurfacing requirements shall be in addition to County Standard Drawing No. <br /> R-29. <br /> 3. Resurfacing for Bell Holes shall meet these requirements. If excavation occurs within <br /> the shoulder or lane, only that area shall be resufaced as shown. <br /> 4. If cross—cutting is performed on Local Roads at intervals less then 150' a Seal <br /> Coat for that half of the roadway containing the trench can be used in lieu of <br /> resurfacing. Section 2-5.03B-2. <br /> c (D <br /> (D <br /> U�U <br /> cU <br /> � o <br /> rn o <br /> c•--c <br /> U U) <br /> Paved Shoulder—�� I a 0 a <br /> a0 <br /> a�,t o <br /> W I I a N U <br /> O <br /> T� <br /> O <br /> I I <br /> �I I <br /> 1 I <br /> ZI <br /> N <br /> V) I I W <br /> T I I I <br /> iO <br /> 171 <br /> 4 F, <br /> O <br /> o� <br /> U) <br /> P <br /> I I JU <br /> TRENCH CUTTING POLICY Approved by: <br /> CROSS CUTTING OF �� <br /> COUNTY ROADWAYS No. Revision Descri tion Date <br /> COLW <br /> TY OF SAN JOAQUIN <br /> DEPARTMENT OF PUBLIC WORKS <br /> Working for YOU Date: DEC 2014 Std. Dwg. No. R-36 <br />