My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2015_PS-1501001 thru PS-1501500_ - PS-1501404
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2015
>
PS-1501001 thru PS-1501500
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2015_PS-1501001 thru PS-1501500_ - PS-1501404
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 4:35:58 PM
Creation date
12/31/2015 4:14:52 PM
Metadata
Fields
Template:
Permits_Development
DocName
PS-1501404
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2015\PS-1501001 thru PS-1501500
Year2
2015
Supplemental fields
Applicant
DR PIPELINE INC
Contracts
CrossReference
Description
ENCROACHMENT PERMIT
DocCategory
Permit Applications (PA)
Notes
Owners
Parcel Address
23 HOOPER DR
Primary Parcel
Type (2)
Tags
Permits_Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Areas: <br /> The entire shoulder of the road is to be <br /> resurfaced. The existing surfacing adjacent to the <br /> trenched area shall be planed to accommodate <br /> the overlay in a manner that does not cause <br /> drainage concerns. The nearest pavement cut <br /> shall be a minimum of three (3) feet from the edge <br /> of pavement, or the remaining pavement shall <br /> also be removed and replaced. (See County <br /> Standard Drawing No. R-31). <br /> 2. Longitudinal Trenches within Traveled Lanes: <br /> The entire traveled lane where the trench is located is to be <br /> resurfaced with a one (1) inch asphalt concrete overlay. The <br /> existing surfacing adjacent to the trenched area shall be planed <br /> to accommodate the overlay in a manner that does not cause <br /> drainage concerns. The overlay shall be in accordance with State <br /> Standard Specifications, Section 39. Aggregate gradation shall be <br /> consistent with the existing surfacing material. (See County <br /> Standard Drawing No. R-31). <br /> 3. Cross-Cutting: <br /> Cross-cutting is allowed at a minimum interval of 150 feet. At each <br /> cross-cut location a minimum of ten (10) feet on each side of <br /> trench shall be planed and resurfaced with one (1) inch asphalt <br /> concrete. If cross cuts are within the 150 feet minimum interval, the <br /> entire section between the first and last cross cut shall be planed <br /> and resurfaced with one (1) inch asphalt concrete. (See County <br /> Standard Drawing No. R-36). <br /> 4. The conditions described in paragraphs 1, 2 and 3 above will not <br /> apply if resurfacing is scheduled within two years. <br /> 2-5.03 Local Roads <br /> A. Surfacing Age Under Three (3) years: No pavement cuts allowed. <br /> Exceptions may be approved in accordance with Section 3910.4 <br /> EXCEPTIONS. <br /> B. Surfacing Age Three (3) to Five (5) Years: <br /> 1. Longitudinal cuts are permitted. A seal coat is required for that half of <br /> the roadway containing the trench. (See County Standard Drawing <br /> No. R-31). <br /> 42 <br />
The URL can be used to link to this page
Your browser does not support the video tag.