My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2015_PS-1501001 thru PS-1501500_ - PS-1501425
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2015
>
PS-1501001 thru PS-1501500
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2015_PS-1501001 thru PS-1501500_ - PS-1501425
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 4:36:03 PM
Creation date
12/31/2015 4:15:08 PM
Metadata
Fields
Template:
Permits_Development
DocName
PS-1501425
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2015\PS-1501001 thru PS-1501500
Year2
2015
Supplemental fields
Applicant
DR PIPELINE INC.
Contracts
CrossReference
Description
ENCROACHMENT PERMIT
DocCategory
Permit Applications (PA)
Notes
Owners
Parcel Address
ALLEY BETWEEN CAROLINA ST. AND INDIANA ST. E/O AUG
Primary Parcel
Type (2)
PS-1501425
Tags
Permits_Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Exhibit A <br /> DR Pipeline,lnc. <br /> Bid Protxlsal License; 974192 <br /> WOODBRIDGE SANITARY DISTRICT <br /> SPOT REPAIR <br /> 2/3/2015 <br /> SCOPE OF WORK: Pot hole existing 6"sewer main 275'from existing sewer manhole#B3-28 listed on <br /> Exhibit A. DRP will saw cut approx.4'W X 81 hole located in alley way, we will make the repair on the <br /> offset joint(VCP main). The new proposed section of pipe we intend to install will be SDR35 with Zea <br /> clay to plastic colder couplings, backfill material will consist of road base to -4". DRP will place 1/2 <br /> asphalt once offset is completed. This price will cover up to 81f of main. Road closed to thru traffic will <br /> be placed at both sides of alley while work is performed. DRP will pull encroachment permit with San <br /> Joaquin County. <br /> TOTAL PRICE$3,788 40 <br /> CONDITIONS: <br /> I)OUR <br /> S WILL BE <br /> REQUIRED OFOR THIS JPRO)ECT,THERE WILLLIBE A.VE 1DJUS I.NIENT O 1 H£CONTR U'RI�A IOL'! I TI E,AMOItS IF E NT WILLABE DETER-MINED BY ON IN A muTU 41.Of LY AGREED ON <br /> PERCENTAGE OFF THE CONTRAC"T AMOUNT. <br /> 2)PHASING OF WORK COULD RESULT IN,ADDITIONAL COSTS DL TO RF_DLCTIONS IN PRODUCTIVFrY <br /> 3)ANY AA'ORK REQUIRED TO BE PERFORIMED IN INCLEIF.\T WEATHER OR OVER OPTIMUM MOISTURE CONDITIONS WILL RESULT IN ADDITIONAL COSTS 11 IAT <br /> WILL BE NEGOTIATED WITH OWNER <br /> J)THERE WILL BE NO REPAIRS OF DNNIAGE rO WORK BY OTHERS AT OUR EXPENSE%FU 1OU7 PRIOR\OTLFICA FION TO DR PIPELINE.1SC. <br /> 5)THUS PROPOSAL REMAINS IN EFFECT"FOR THIRTYDAYS FROM I'iI E D.A-rr OF PROPOSAL AFTER TIBRTY DAYS,t1'E RES£RAT,THE RIGHT TO PEVISE OUR <br /> PROPOSAL.DUE TO ANY COST FLUCTU ArIONS <br /> 6)PRICE IS SUBJECT TO REVIE\\'OF FINAL PLANS,SOILS REPORTS,AND CONTRACT DOCLME I-S THE EXCLUSIO\A\'DCO\DE TIONS OF THIS PROPOSAL SHALL <br /> BE ASSUMED TO BE A PART OF ANY SL"BSFQUENT CONTRACT <br /> LNCLBSIOSS: <br /> I)BONDS,ENGINEERING.STAKING.4100 -9-,FEES,OR ANY TESTING. <br /> I)INSPFCTIO\S OR HANDLING OF ANY H.ALAKDOCS WASTE <br /> 3)EROSION CONTROL,S%%PP.INLET FILTERS.ETC <br /> A)ASBESTOS SURVEY OR ABATEMENT <br /> 5)WINTER MAINTANCE INCLUDING PUMPING.TFNIPORARY ROADS,SOIL.TREA'T\IE\TS.ETC <br /> 611 ANY RELOC ATION OF EXISTING FACLL.ETIES OR STRLC'TIJRES <br /> 7)DEWATERt\G <br /> 9)OVER EXCAVATION <br /> 9)PRIME OIL,FOG SEAL,OR SEAL COAT <br /> 10)IPORTOR EXPORT OF A\Y MATERLAL <br /> 11)NO S.�-E�,'TTt-"G- <br /> 12)A:B-tSPu-.�T :I,tiC:$R-(:OtiCRI;F-I:.-FLAF4t'l3E-K <br /> 13)ANYTTBNG NOT SPECIFICALLY MENTIONED IN OUR PROPOSAL IS DEFACED ESC'LODED <br /> la)ANY WATER METERS <br /> 15)NO DEMO UNLESS NOTED ON OUR BID PROPOSAL <br /> 16)LOCATE EXISTING UTILIFIFS <br /> 17)SHOP DRAWINGS <br /> 18)CATHODIC PROTECTION <br /> 19)PAINTING:SIGNAGE <br /> 20)NO ROCK CAUSF-1RE\IOVAI. <br /> 21)TREATMEic SOIL <br /> 22)NO TR,\FFtC CONTROL PLAY <br /> Ru ers-President Date <br /> Thank you for giving us a chance to id this project we look forward to working with you <br /> DR Pipeline, Inc. <br /> 23 Hooper Dr. <br /> Stockton, CA 95203 <br /> Ph.209-858-2100 Fax 209-370-8113 <br /> Russell Bowers-President(209)430-3711 RussellCFhdrDi eline.ngt <br />
The URL can be used to link to this page
Your browser does not support the video tag.