SPECIAL CONDITIONS FOR <br /> BYRON ROAD WATER LINE -TRACY <br /> ENCROACHMENT PERMIT <br /> 1. Maintain traffic controls for all roads. Traffic control delays shall not exceed 15 minutes. <br /> Two-way traffic shall be maintained during non-working hours with excavated areas backfilled or <br /> plated. During working hours, two-way traffic control shall be maintained at all times per <br /> approved traffic control plans. <br /> 2. Access to all properties shall be maintained at all times except when work is occurring at the <br /> access point. Minimal delays will be allowed to provide access within the work zone area. <br /> Driveway access shall be fully restored at the end of each workday. Driveways disturbed by the <br /> contractor shall be replaced with in-kind or better materials. <br /> 3. Residents and businesses shall be notified in writing, as approved by the County, 48 hours in <br /> advance of any impacts to their access. <br /> 4. Any areas where parking is to be restricted shall have signs noting the restrictions in place at <br /> least 48 hours in advance. <br /> 5. Existing fences shall not be removed without written consent of the property owner such consent <br /> shall be submitted to the County prior to the removal. Fences removed shall be restored with in- <br /> kind or better materials at the edge of the right-of-way. <br /> 6. Work shall not be permitted within the San Joaquin County right-of-way between November 1 and <br /> March 31 without prior authorization from the San Joaquin County Field Engineering Division, <br /> contact them at 209-953-7421. <br /> 7. All pavement markings destroyed or obliterated must be replaced in kind by the permittee. Typical <br /> pavement markings include, but not limited to, lane lines, centerlines, stop and stop ahead <br /> legends, limit lines, raised pavement markers and miscellaneous delineators. <br /> 8. The Permittee is responsible for the preservation of survey monuments located within the area of <br /> work herein permitted. Prior to the start of construction, survey monuments that potentially may <br /> be disturbed shall be located and referenced by a Licensed Land Surveyor, and a Corner Record <br /> filed with the County Surveyor. Any Survey Monuments disturbed during the course of <br /> construction shall be reestablished by a Licensed Land Surveyor and another Corner Record filed <br /> with the County Surveyor. (Land Surveyors' Act Section 8771) <br /> 9. All pipe and pipeline related facilities including, but not limited to, valves, utility boxes and vaults, <br /> and frames and covers shall be maintained by City of Tracy. City of Tracy shall be responsible <br /> for any and all costs associated with the removal, relocation and/or adjustment of these facilities <br /> as determined by the County at City of Tracy's expense. (Streets and Highways Code 1463) <br /> 10. All future maintenance of the pipeline and related facilities within the County right-of-way will <br /> require a San Joaquin County Encroachment Permit. <br /> 11. Length of open, unbackfilled trench shall be limited to a total maximum length of 250 linear feet <br /> during working hours. <br />