My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2015_PS-1501001 thru PS-1501500_ - PS-1501468
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2015
>
PS-1501001 thru PS-1501500
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2015_PS-1501001 thru PS-1501500_ - PS-1501468
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 4:36:16 PM
Creation date
12/31/2015 4:15:44 PM
Metadata
Fields
Template:
Permits_Development
DocName
PS-1501468
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2015\PS-1501001 thru PS-1501500
Year2
2015
Address
N/S EUCLID AV 10' W/O MISSION AV
Application
CALIFORNIA WATER SERVICE
Supplemental fields
APN
PS-1501468
Cross Ref
PWP730077
DocCategory
Permit Applications (PA)
Type (2)
Encroachment Permit (EP)
Tags
Permits_Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
NOTES: <br /> 1. If the distance between cross—cuts are less then 150' the entire area between <br /> corss—cuts shall be planed and resurfaced with one (1) inch of Asphalt Concrete. <br /> 2. The resurfacing requirements shall be in addition to County Standard Drawing No. <br /> R-29. <br /> 3. Resurfacing for Bell Holes shall meet these requirements. If excavation occurs within <br /> the shoulder or lane, only that area shall be resufaced as shown. <br /> 4. If cross—cutting is performed on Local Roads at intervals less then 150' a Seal <br /> Coat for that half of the roadway containing the trench can be used in lieu of <br /> resurfacing. Section 2-5.03B-2. <br /> -v <br /> C o <br /> v +, <br /> �� L <br /> U�U <br /> p C <br /> CU <br /> O <br /> ct— <br /> rn�Q <br /> Paved Shoulder— Maio Q <br /> C3"- <br /> v o <br /> C n-C <br /> IL W I I v 0 U <br /> 1 IL L.� <br /> O <br /> L <br /> O_ <br /> L <br /> I 1 I <br /> �I I <br /> 1 1 <br /> ZI 1 I <br /> NI <br /> U) I I Q <br /> I I LJJ <br /> O <br /> V J F+ <br /> O <br /> + O <br /> O <br /> O <br /> I 1 I :JU <br /> • TRENCH CUTTING POLICY Approved by: <br /> CROSS CUTTING OF "W.a W, <br /> COUNTY ROADWAYS No. Revision Description Date <br /> +�► COUNTY OF SAN JOAQUIN <br /> y ,, DEPARTMENT OF PUBLIC WORKS <br /> WorE ' for ��U Date: DEC 2014 Std. Dwg. No. R-36 <br />
The URL can be used to link to this page
Your browser does not support the video tag.