My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2015_PS-1501501 thru PS-1502000_ - PS-1501529
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2015
>
PS-1501501 thru PS-1502000
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2015_PS-1501501 thru PS-1502000_ - PS-1501529
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 4:36:37 PM
Creation date
12/31/2015 4:20:54 PM
Metadata
Fields
Template:
Permits_Development
DocName
PS-1501529
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2015\PS-1501501 thru PS-1502000
Year2
2015
Supplemental fields
Applicant
PACIFIC GAS & ELECTRIC - FRESNO
Contracts
CrossReference
Description
ENCROACHMENT PERMIT
DocCategory
Permit Applications (PA)
Notes
POLE REPLACEMENT BORE(OVER 12 INCH DIA)
Owners
Parcel Address
W/S OF ENDOW RD, 800' S/O HOWARD RD. HOWARD RD
Primary Parcel
Type (2)
PS-1501529
Tags
Permits_Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
NOTES: <br /> 1. If the distance between cross—cuts are less then 150' the entire area between <br /> corss—cuts shall be planed and resurfaced with one (1) inch of Asphalt Concrete. <br /> 2. The resurfacing requirements shall be in addition to County Standard Drawing No. <br /> R-29. <br /> 3. Resurfacing for Bell Holes shall meet these requirements. If excavation occurs within <br /> the shoulder or lane, only that area shall be resufaced as shown. <br /> 4. If cross—cutting is performed on Local Roads at intervals less then 150' a Seal <br /> Coat for that half of the roadway containing the trench can be used in lieu of <br /> resurfacing. Section 2-5.03 (B-2). <br /> ° 41 <br /> Q) <br /> U�U <br /> C7 � <br /> O <br /> �U <br /> O O <br /> co <br /> c U) <br /> Paved Shoulder--�►I I 0 Q <br /> o`~ <br /> ° <br /> Q) <br /> w ° Qv <br /> o_ <br /> V <br /> o_ <br /> i <br /> z°' I <br /> (D I I CL <br /> i w <br /> V <br /> 0 <br /> L <br /> F41o � 3 <br /> 0 U <br /> o <br /> +� O <br /> O <br /> J U <br /> TRENCH CUTTING POLICY Approved by: <br /> CROSS CUTTING OF <br /> COUNTY ROADWAYS No. Revision Description Date <br /> COUNTY OF SAN JOAQUIN <br /> DEPARTMENT OF PUBLIC WORKS <br /> wUI'�lII�' for YODate: MAY 2015 Std. Dwg. No. R-36 <br />
The URL can be used to link to this page
Your browser does not support the video tag.