Laserfiche WebLink
NOTES: <br /> 1. If the distance between cross—cuts are less then 150' the entire area between <br /> corss—cuts shall be planed and resurfaced with one (1) inch of Asphalt Concrete. <br /> 2. The resurfacing requirements shall be in addition to County Standard anard Drawin g No <br /> 3. Resurfacing for Bell Holes shall meet these requirements. If excavation occurs wi <br /> the shoulder or lane, only that area shall be resufaced as shown. thin <br /> 4. If cross—cutting is performed on Local Roads at intervals less then 150' a Sep <br /> Coat for that half of the roadway containing the trench can be used in lieu of <br /> resurfacing. Section 2-5.03 (B-2). <br /> a O <br /> U�U <br /> Q � <br /> � cU <br /> cn O <br /> Paved Shoulder <br /> I Q <br /> o <br /> a. I C: n <br /> 0 U) <br /> 0 <br /> _o <br /> L <br /> �I I <br /> o I <br /> Z' <br /> N <br /> I ' I <br /> a� <br /> NI I W <br /> ' I i <br /> _o <br /> 1 <br /> O <br /> m <br /> I Lo <br /> O <br /> _1 U <br /> TRENCH CUTTING POLICY <br /> Approved by: <br /> OSS CUTTING OF <br /> COROADWAYS <br /> LINTY ROADW <br /> AYS No. Revision D <br /> COUNTY OF escri tion Date <br /> 'Working fc�r 'YOU SAN JOAQUIN <br /> DEPARTMENT OF PUBLIC WORKS <br /> Date: MAY 2015 Std. Dwg. No. R-36 <br />