Laserfiche WebLink
SPECIAL PROVISIONS , <br /> Winter Weather Utility Work <br /> 1. SUPERVISION• The utility compai?y(permittee) shall furnish full=time supervision of all work to insure <br /> compliance with the permit provision. <br /> 2. START OF WORK: No work within the County-right-of-way shall be started until the utility company <br /> representative has made an evaluation of weather conditions and has determined the work can be <br /> accomplished under the provisions of the permit. <br /> 3. CLEAN PAVEMENT: Dirt and mud shall not be deposited on the pavement outside the area of work, <br /> d if inadvertently tracked onto the road trayel way shah be removed immediatel <br /> anY. <br /> 4. DAILY RESTORATION: Private driveways acid toad intersections shall be restored daily. <br /> 5. WEATHER-TIGHT CONDITIONS: . All.trenches shall be.filled and compacted,ditches and other <br /> drainage facilities regarded and opened, and the entire work area restored to weather-tight condition prior to <br /> any rain. <br /> F:1PER1vIITS COUNTER\general provisionsWTinter Weather Provisions.d= - - <br />