Laserfiche WebLink
NOTES: <br /> 1. If the distance between cross—cuts are less then 150' the entire area between <br /> corss—cuts shall be planed and resurfaced with one (1) inch of Asphalt Concrete. <br /> 2. The resurfacing requirements shall be in addition to County Standard Drawing No. <br /> R-29. <br /> 3. Resurfacing for Bell Holes shall meet these requirements. If excavation occurs within <br /> the shoulder or lane, only that area shall be resufaced as shown. <br /> 4. If cross—cutting is performed on Local Roads at intervals less then 150' a Seal <br /> Coat for that half of the roadway containing the trench can be used in lieu of <br /> resurfacing. Section 2-5.03 (B-2). <br /> o 4, <br /> VCU <br /> Q � <br /> O O <br /> � cU <br /> U) O <br /> 01= 0 <br /> co <br /> Paved Shoulder i .5� <br /> C)Q <br /> o ~ <br /> o <br /> U) O <br /> W 1 I n <br /> O <br /> T_ <br /> O <br /> 1 <br /> 41 <br /> z' I <br /> Q) <br /> w <br /> � I <br /> T_ <br /> 0 <br /> C) 4-0 <br /> + O <br /> Cn <br /> rn <br /> E O <br /> i J U <br /> TRENCH CUTTING POLICY Approved by: <br /> CROSS CUTTING OF Av"� <br /> COUNTY ROADWAYS <br /> No. Revision Description Date <br /> �► COUNTY OF SAN JOAQUIN <br /> DEPARTMENT OF PUBLIC WORKS <br /> Wort ng for YOU Date: MAY 2015 Std. Dwg. No. R-36 <br />