Laserfiche WebLink
, <br /> NOTES: <br /> 1. If the distance between cross—cuts are less then 150' the entire area between <br /> corss—cuts shall be planed and resurfaced with one (1) inch of Asphalt Concrete. <br /> 2. The resurfacing requirements shall be in addition to County Standard Drawing No. <br /> R-29. <br /> 3. Resurfacing for Bell Holes shall meet these requirements. If excavation occurs within <br /> the shoulder or lane, only that area shall be resufaced as shown. <br /> 4. If cross—cutting is performed on Local Roads at intervals less then 150' a Seal <br /> Coat for that half of the roadway containing the trench can be used in lieu of <br /> resurfacing. Section 2-5.03 (8-2). <br /> C <br /> C3 41 <br /> Q � <br /> : �0 <br /> U) o <br /> -N <br /> 0i cn cn <br /> Paved Shoulder—�� I e Q <br /> D`~ <br /> O� O <br /> O <br /> V ./07 <br /> O <br /> 1 <br /> QJ <br /> z. <br /> N <br /> 1 W <br /> I <br /> O <br /> 4_1 <br /> O :3 <br /> `+—U <br /> O <br /> u' <br /> EO <br /> TRENCH CUTTING POLICY Approved by: <br /> CROSS CUTTING OF xal � <br /> COUNTY ROADWAYS No. Revision Description Date <br /> COUNTY OF SAN JOAQUIN <br /> DEPARTMENT OF PUBLIC WORKS <br /> OR'�C1IIg for ��U Date: MAY 2015 Std. Dwg. No. R-36 <br />