My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2015_PS-1501501 thru PS-1502000_ - PS-1501926
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2015
>
PS-1501501 thru PS-1502000
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2015_PS-1501501 thru PS-1502000_ - PS-1501926
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 4:37:43 PM
Creation date
12/31/2015 5:00:22 PM
Metadata
Fields
Template:
Permits_Development
DocName
PS-1501926
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2015\PS-1501501 thru PS-1502000
Year2
2015
Supplemental fields
Applicant
PACIFIC GAS & ELECTRIC - STOCKTON
Contracts
CrossReference
Description
ENCROACHMENT PERMIT
DocCategory
Permit Applications (PA)
Notes
TO REPAIR PAVING IN STREET
Owners
Parcel Address
E/S OF COOLIDGE AVE. 471' S/O WASHINTON ST.
Primary Parcel
Type (2)
PS-1501926
Tags
Permits_Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
NOTES: <br /> 1. If the distance between cross—cuts are less then 150' the entire area between <br /> corss—cuts shall be planed and resurfaced with one (1) inch of Asphalt Concrete. <br /> 2. The resurfacing requirements shall be in addition to County Standard Drawing No. <br /> R-29. <br /> 3. Resurfacing for Bell Holes shall meet these requirements. If excavation occurs within <br /> the shoulder or lane, only that area shall be resufaced as shown. <br /> 4. If cross—cutting is performed on Local Roads at intervals less then 150' a Seal <br /> Coat for that half of the roadway containing the trench can be used in lieu of <br /> resurfacing. Section 2-5.03 (B-2). <br /> 4J <br /> C� <br /> U�U <br /> 6 r <br /> O <br /> D cU <br /> O�J <br /> � Q <br /> J <br /> i <br /> &J Q <br /> Paved Shoulder— <br /> o <br /> aCOes <br /> P C <br /> V <br /> o_ <br /> T_ <br /> CD_ <br /> 1 <br /> i <br /> 4_1 <br /> Z' <br /> N <br /> co I i w <br /> 1 <br /> i I <br /> 4 <br /> O <br /> T� <br /> 4 <br /> O �� <br /> `t-U <br /> M/L o <br /> aJ <br /> E O <br /> JU <br /> • TRENCH CUTTING POLICY Approved by: <br /> CROSS CUTTING OF <br /> COUNTY ROADWAYS No. Revision Description Date <br /> COUNTY OF SAN JOAQUIN <br /> DEPARTMENT OF PUBLIC WORKS <br /> worldng for Y Date: MAY 2015 Std. Dwg. No. R-36 <br />
The URL can be used to link to this page
Your browser does not support the video tag.