Laserfiche WebLink
NOTES: <br /> 1. If the distance between cross—cuts are less then 150' the entire area between <br /> corss—cuts shall be planed and resurfaced with one (1) inch of Asphalt Concrete. <br /> 2. The resurfacing requirements shall be in addition to County Standard Drawing No. <br /> R-29. <br /> 3. Resurfacing for Bell Holes shall meet these requirements. If excavation occurs within <br /> the shoulder or lane, only that area shall be resufaced as shown. <br /> 4. If cross—cutting is performed on Local Roads at intervals less then 150' a Seal <br /> Coat for that half of the roadway containing the trench can be used in lieu of <br /> resurfacing. Section 2-5.03 (B-2). <br /> 6 �J <br /> VCU <br /> Q r <br /> O <br /> cU <br /> U) O,J <br /> J <br /> Paved Shoulder— <br /> o <br /> a_ O ca O <br /> u e a- C <br /> o_ <br /> T_ <br /> CD41_ <br /> 41 <br /> z' <br /> a� <br /> c ' <br /> � I � <br /> CD <br /> L <br /> F J <br /> CD,_ <br /> "-0 <br /> 8 O <br /> L � co <br /> E O <br /> TRENCH CUTTING POLICY Approved by: <br /> CROSS CUTTING OF la/ <br /> COUNTY ROADWAYS <br /> No, Revision Description Date <br /> �.�► <br /> COUNTY OF SAN JOA UIN <br /> DEPARTMENT OF PUBLIC WORKS <br /> orldng for YOU Date: MAY 2015 Std. Dwg. No. R-36 <br />