Laserfiche WebLink
NOTES: <br /> 1. If the distance between cross—cuts are less then 150' the entire area between <br /> corss—cuts shall be planed and resurfaced with one (1) inch of Asphalt Concrete. <br /> 2. The resurfacing requirements shall be in addition to County Standard Drawing No. <br /> R-29. <br /> 3. Resurfacing for Bell Holes shall meet these requirements. If excavation occurs within <br /> the shoulder or lane, only that area shall be resufaced as shown. <br /> 4. If cross—cutting is performed on Local Roads at intervals less then 150' a Seal <br /> Coat for that half of the roadway containing the trench can be used in lieu of <br /> resurfacing. Section 2-5.03 (B-2). <br /> C <br /> o +, <br /> �f Q) <br /> UuU <br /> Q C <br /> O O <br /> U) O <br /> �s a <br /> Paved Shoulder---�� i x a)Q <br /> O U� <br /> D <br /> O <br /> w 2 C U <br /> 0 <br /> o_ <br /> zi I <br /> O <br /> 1 W <br /> T I I i <br /> q� <br /> O <br /> L J <br /> _T_ 1 <br /> O <br /> O <br /> +� co <br /> E O <br /> TRENCH CUTTING POLICY Approved by: <br /> CROSS CUTTING OF Aylljj� <br /> COUNTY ROADWAYS No. Revision Description Date <br /> . COUNTY OF SAN JOAQUIN <br /> DEPARTMENT OF PUBLIC WORKS <br /> Wt7rjCYIIg for YOUDate: MAY 2015 Std. Dwg. No. R-36 <br />