Laserfiche WebLink
NOTES: <br /> 1. If the distance between cross—cuts are less then 150' the entire area between <br /> corss—cuts shall be planed and resurfaced with one (1) inch of Asphalt Concrete. <br /> 2. The resurfacing requirements shall be in addition to County Standard Drawing No. <br /> R-29. <br /> 3. Resurfacing for Bell Holes shall meet these requirements. If excavation occurs within <br /> the shoulder or lane, only that area shall be resufaced as shown. <br /> 4. If cross—cutting is performed on Local Roads at intervals less then 150' a Seal <br /> Coat for that half of the roadway containing the trench can be used in lieu of <br /> resurfacing. Section 2-5.03 (B-2). <br /> o 4, <br /> Q � <br /> O <br /> UJ <br /> Paved Shoulder °C' <br /> a`0 <br /> 0 <br /> `r o <br /> W O O U <br /> O <br /> '7� <br /> 4 <br /> O <br /> 1 <br /> 41 <br /> z' I <br /> U 1 W <br /> I <br /> o_ <br /> o � <br /> o <br /> +, co <br /> E O <br /> TRENCH CUTTING POLICY Approved by: <br /> CROSS CUTTING OF <br /> COUNTY ROADWAYS No. Revision Description Date <br /> COUNTY OF SAN JOAQUIN <br /> DEPARTMENT OF PUBLIC WORKS <br /> QVOrkiIIg for YOU Date: MAY 2015 Std. Dwg. No. R-36 <br />