My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2015_PS-1502001 thru PS-1502500_ - PS-1502152
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2015
>
PS-1502001 thru PS-1502500
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2015_PS-1502001 thru PS-1502500_ - PS-1502152
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 4:38:17 PM
Creation date
12/31/2015 5:08:53 PM
Metadata
Fields
Template:
Permits_Development
DocName
PS-1502152
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2015\PS-1502001 thru PS-1502500
Year2
2015
Address
S/S SEVILLE AVE 284' E/O BALBOA AVE
Application
PACIFIC GAS & ELECTRIG-STOCKTON
Supplemental fields
APN
PS-1502152
Cross Ref
PWP730052
DocCategory
Permit Applications (PA)
Type (2)
Encroachment Permit (EP)
Tags
Permits_Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
See Note I Below <br /> Bastin <br /> 6" Min 6rp a emen <br /> 6" Mill <br /> yp) <br /> 3) 011 See Note 2 Below <br /> Corhpact in 12" max <br /> layers to a min relative <br /> T -------_—————— compaction of 95% <br /> —————— — undej pavement and ——— ——— Var <br /> -- <br /> V�--r 1 90% outside pavemenL <br /> Compact in 24" max <br /> + <br /> layers' to a min relative 0D12D, <br /> OD/2 compaction of 85%. <br /> Compact In 6" layers <br /> to a mill relative <br /> compaction of 90%. <br /> 10" Min D ---10" Min <br /> 10" Min Min 10" Min <br /> OQ OD <br /> + 20". Min <br /> RIGID CONDUIT FLEXIBLE CONDUIT <br /> NQIM <br /> 1. New pavement shall be '1" thicker than existing pavement, minimum. <br /> of 0.25 Ft. <br /> 'New base shall be I" thicker than existing base, rnin of o.-5c) Ft. <br /> - <br /> 2. Select native material or imported gran-ular material as approved by the Director <br /> L <br /> of Public Works. Backfill with materials equal to or better than the existing <br /> L <br /> pavement and base in quality. <br /> I Relative compactionof materials shall be tested in accordance with <br /> the- State of California, Dept. of Tr-ansportation' Testing Manuals, ..test <br /> method No. California 216 or 231. <br /> 4. All existing pavdment shall be. neatly cut to line prior to trench excavation. <br /> -ii <br /> 5 Jetting or ponding will be permitted within the street right—of—way 'with n. <br /> a 3 year bond, when approved by the Director of Public Works. <br /> 6. When shown by soil composition and compact ability, ninety percent (90%) <br /> compaction may be used, when approved by the Director of 'Public Works. <br /> T Special bedding and backfill requirements may be shown on the plans or- <br /> specified in the special provisions. <br /> Approved by: <br /> vvow • <br /> ® <br /> TRENCH BAC KIFILL <br /> TV f <br /> WIFCAL TRI I, <br /> LQ <br /> No. Revision Description <br /> Date <br /> A P124' —.1 <br /> COUNTY OF SAN JOAQUTV <br /> DEPARTMENT OF PUBLIC WORKS <br /> woz for. YOU <br /> c1l, <br /> Std. Dwg. No. <br /> Date: bEC.2014 C <br />
The URL can be used to link to this page
Your browser does not support the video tag.