My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2015_PS-1502001 thru PS-1502500_ - PS-1502165
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2015
>
PS-1502001 thru PS-1502500
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2015_PS-1502001 thru PS-1502500_ - PS-1502165
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 4:38:32 PM
Creation date
12/31/2015 5:10:30 PM
Metadata
Fields
Template:
Permits_Development
DocName
PS-1502165
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2015\PS-1502001 thru PS-1502500
Year2
2015
Address
E/S ESCALON BELLOTA RD 3680' S/O COPPERO
Application
PACIFIC GAS & ELECTRIC- SACRAMENTO
Supplemental fields
APN
PS-1502165
Cross Ref
PWP730052
DocCategory
Permit Applications (PA)
Type (2)
Encroachment Permit (EP)
Tags
Permits_Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
See Note 1 Below <br /> Existing- <br /> 6 Min 6Pavement 6" 6" Min <br /> (�YP)i �� <br /> �..::.: (IYP) <br /> 3' OF, \ \i See Note 2 Below \\ \\ <br /> Compact in 12" max _ 31-p" <br /> �\ \\ layers to a min relative <br /> \\ \� compaction of 95% <br /> --_ under pavement end \ -------- \ Var <br /> Var \\ _-- --_ \\ 90% outside pavement. ' <br /> �O Compact in 24" max y <br /> \� layers" tot a min relative OD , 12„ <br /> OD/2 �\ \\ -compaction of 85%. <br /> Compact in 6 layers <br /> to a min relative <br /> compaction of 9O%. <br /> 10” Min OD -10" Min 10" Min OD —10" Min <br /> OD OD <br /> + 20" Min <br /> + 20"• Min <br /> RIGID CONDUIT FLEXIBLE CONDUII <br /> NOTES- <br /> 1- <br /> OTES:1. New pavement shall be 1" thicker than existing pavement, minimum. <br /> of 0.25 - Ft. 'New base shall be 1" thicker than existing base, min of 0.50 Ft. <br /> 2. Select native material or imported gran-ular material as approved by the Director <br /> of Public Works. Bockfill with materials equal to or better than the existing <br /> pavement and base in quality. <br /> 3. Relative compaction of materials shall be tested in accordance with <br /> the- State of California, Dept. of Transportation Testing Manuals, :test <br /> method No. California 216 or 231. <br /> 4. All existing pavement shall be. neatly cut to litre prior to trench excavation. <br /> 5. Jetting or ponding will be permitted within the street right-of-way with <br /> a 3 year bond, when approved by the Director- of Public Works. <br /> 6. When shown by soil composition and compact.ability, ninety percent (90%) <br /> compaction may be used, when approved by the Director of Public Works. <br /> T. Special bedding and backfill requirements may be shown on the plans or <br /> specified in the special provisions. <br /> Approved by: <br /> C4, <br /> TYIPCAL TRENCH BACKFILL <br /> No. Revision Description Date <br /> �_� w COUNTY OF SAN J®A�UIl� <br /> Lyr DEPARTMENT OF PUBLIc,,VORKS <br /> Date: DEC 201 Std. Dwg. No. R 9.9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.