Laserfiche WebLink
NOTES: <br /> 1. If the distance between cross—cuts are less then 150' the entire area between <br /> corss—cuts shall be planed and resurfaced with one (1) inch of Asphalt Concrete. <br /> 2. The resurfacing requirements shall be in addition to County Standard Drawing No. <br /> R-29. <br /> 3. Resurfacing for Bell Holes shall meet these requirements. If excavation occurs within <br /> the shoulder or lane, only that area shall be resufaced as shown. <br /> 4. If cross—cutting is performed on Local Roads at intervals less then 150' a Seal <br /> Coat for that half of the roadway containing the trench can be used in lieu of <br /> resurfacing. Section 2-5.03 (B-2). <br /> c m <br /> U�U <br /> O � <br /> O <br /> cU <br /> Cf) o 41 <br /> a,-C v <br /> c• <br /> 0- <br /> &j <br /> &j a <br /> Paved Shoulder—r I o 0 4- <br /> o� o <br /> 4 U <br /> 0- <br /> 6 O <br /> T_ <br /> +O <br /> 1 <br /> 1 <br /> 41 <br /> z. <br /> N <br /> (n 1 W <br /> T <br /> 4 <br /> O <br /> T_ Ji+ <br /> O 7 <br /> O <br /> +1Cn <br /> Cn <br /> o <br /> ELI _j U <br /> • TRENCH CUTTING POLICY Approved by: <br /> CUTTING OF <br /> CROSS Aa"� <br /> COUNTY ROADWAYS No. Revision Description Date <br /> COUNTY OF SAN JOAQUIN <br /> DEPARTMENT OF PUBLIC WORKS <br /> Std. Dwg. No. R-36 <br /> 'working for YOU Date: MAY 2015 <br />