Laserfiche WebLink
NOTES: <br /> 1. If the distance between cross—cuts are less then 150' the entire area between <br /> corss—cuts shall be planed and resurfaced with one (1) inch of Asphalt Concrete. <br /> 2. The resurfacing requirements shall be in addition to County Standard Drawing No. <br /> R-29. <br /> 3. Resurfacing for Bell Holes shall meet these requirements. If excavation occurs within <br /> the shoulder or lane, only that area shall be resufaced as shown. <br /> 4. If cross—cutting is performed on Local Roads at intervals less then 150' a Seal <br /> Coat for that half of the roadway containing the trench can be used in lieu of <br /> resurfacing. Section 2-5.03 (B-2). <br /> .0 <br /> o t, <br /> U�U <br /> 0 <br /> � <br /> O�U <br /> o <br /> 0,-S--o <br /> c•—s <br /> Q <br /> Paved Shoulder--r I a Q <br /> 0O 0 <br /> N' <br /> C: :3 <br /> D 0 0 U <br /> W 1 D_ C <br /> O <br /> O <br /> 1 <br /> 1 <br /> N <br /> zi i <br /> N <br /> V) 1 W <br /> i I i <br /> V <br /> O <br /> J41 <br /> O <br /> + o <br /> J— 41 u� <br /> o <br /> • TRENCH CUTTING POLICY Approved by: <br /> CUTTING OF <br /> CROSS CU Aa"/J� <br /> COUNTY ROADWAYS No. Revision Description I Date <br /> vti COUNTY OF SAN JOAQUIN <br /> DEPARTMENT OF PUBLIC WORKS <br /> 'a'o'ymg for YOUDate: MAY 2015 Std. Dwg. No. R-36 <br />