Laserfiche WebLink
e • ' <br /> GENERAL PROVISIONS <br /> GOVERNING INSTALLATION OF SUBSURFACE STRUCTURES AND PIPELINES WITHIN COUNTY ROAD;RIGHTS-OF-WAY <br /> PUBLIC CONVENIENCE AND SAFETY: <br /> A. Before obstructing any private driveway entrance or County road.traveled way with a trench,spoil bank,equipment or other barrier permitted for any <br /> prolonge,cLperiod of time,the Permittee shall notify the known u,,ars of the respective thoroughfare(s)involved,and shall provide access for vehicular and <br /> pedestrian traffic to and from the road. <br /> I. Unless otherwise permitted,all work shall be conduct,-d in such a manner that no less than one lane of the existing County road traveled way will <br /> be maintained open to public traffic during working h Durs in a smooth and safe riding condition(s). Two lanes shall be open after working hours. <br /> 2. In cases where road closure is permitted,the permission to close the road will be granted under the condition that the Permittee notify the <br /> following persons and/or agencies of the time,the per..od of closure,and-the detour route at least twenty-four(24)hours prior to said road closure. <br /> a The County of San Joaquin Public Works Department d. The Iocal fire district <br /> b. The County of San Joaquin Sheriffs Office e. The local school district <br /> c. The local postal service f The local residents irtvolved <br /> B. Should hazardous conditions relative to the installation operations warrant flagmen,as many capable flagmen as may be necessary shall be provided-by the <br /> Permittee and stationed in advance of work to wam and direct tra:yic. <br /> C. Lights,signs and barricades shall be furnished,erected and maintained by the Permittee for the adequate warning and convenience of the public,with <br /> particular attention to be taken in this regard after dark <br /> D.. Any excess dirt and/or debris which might be a hazard to either at tomobile or pedestrian traffic,uncontrollable by lights,signs and barricades,shall be <br /> removed from the jobsite daily. <br /> STRUCTURES•. <br /> A- Walls of structures shall be such quality and strength that they wil:resist all pressures and will not crack or be deformed in such a way as to create a hazard <br /> or maintenance problern at any time. Therefore,the minimum stn ctural requirements for concrete pipe placed under county road rights-of-way shall <br /> conform to the`following American Association of State Highway and transportation Officials(AASHTO)designations. <br /> 1. For concrete pipe up to and including thirty-three inches(33")inside diameter,extra strength concrete conforming to AASHTO Designation M <br /> 170M. <br /> 2. For concrete pipe thirty-six inches(36")inside diameter and larger,reinforced concrete pipe conforming to AASHTO Designation M 170M Class <br /> M. <br /> 3. Plastic pipe conforming to AASHTO Designation M294. <br /> B. All concrete pipe joints with County road rights-of-way shall be sealed against leakage and/or.infiltration with rubber gasket in conformance with Section <br /> 65-1:06 of the California Standard Specifications,or with other methods as may be permitted under the Special Provisions. <br /> C. Cast-in-place concrete pipe,vitrified clay pipe,spiral welded steel pipe,or corrugated aluminum alloy pipe shall not be installed within the County road <br /> rights-of-way unless specifically so stated in the Special Provisions,and only under the conditions as provided. <br /> D: All structures to be buried within the County rights-of-way shall be set at such elevations as to allow minimum coverage of thirty inches(30")to the <br /> centerline of the roadways and twelve inches(12'�at the bottoms of borrow ditches each side of the roadways. The depths of structures shall be established <br /> below a flat plane extending across the rights-of-way,no part of wl.ich shall extend above the elevations stated above;manholes,lampholes,valves,etc.not <br /> included. Future surface elevations shall be anticipated as nearly as possible and structure elevations shall be established for future adjustments accordingly. <br /> E. The County hereby reserves the right to specify in the Special Provisions the gage and surface treatment of any galvanized corrugated metal pipe that is to be <br /> installed. <br /> F. All longitudinal utility facilities are to be established(and dimensioned on sketches)from surveyed centerline of road right-of-way,not from right-of-way <br /> (border)lines. <br /> REPAIRS OF THE COUNTY RIGHT-OF-WAY: <br /> A. All excavations shall be backfilled and compacted immediately after work therein has been completed. <br /> B. Trenched shall not be left open farther than 300 feet in advance of p ipe laying operations,or 200 feet to the rear thereof,unless otherwise permitted by the <br /> Engineer. <br /> C. Unless otherwise permitted under the Special Provisions,backfill Shall be placed and mechanically compacted in'such a manner that the relative compaction <br /> throughout the entire fill within the County road right-of-way shall conform to the percentages of compaction as shown on the Trench detail. <br /> D. Backfill material shall be placed in horizontal uniform layers not to exceed in thickness,before compaction,0.67 foot in the bedding region,one—foot where <br /> 90%compaction is required,and two-feet where 80%compaction is required. <br /> E. No portion of the excavation(s)shall be compacted by ponding or je ting unless a maintenance bond is provided. <br /> F. Gravel backfill material shall be utilized only where specifically so stated on the face of the permit It shall be compacted by means of a high-frequency <br /> internal vibrator,the compactor to be a size and type approved by the Engineer. Points of compaction shall not be greater than 18"centers and to the full <br /> depth of the lift <br /> G. All pavements,curbs,gutters,sidewalks,borrow ditches,pipes,head wails,road signs,trees,shrubbery,and/or other permanent road facilities impaired by <br /> or as a result of construction operations at the construction site(s)occupied by materials and/or equipment,shall be restored immediately upon backfilling of <br /> the excavation to the original grades and cross sections,and to a condition as good as,or better than existing prior to construction. <br /> H. All surfacing materials of roadways and driveway approaches cut or damaged by or as a result of construction.operations,shall be replaced within ONE <br /> WEEK following the backfilling of excavation,weather permitting,with compacted layers of surfacing materials at least as thick as the existing,and no less <br /> than two inches(2")of asphalt concrete over six inches(6")of aggregate base,both as specified below. <br /> -'r.- Asphalt Concrete:Combined mineral aggregate shall conform to the quality and gradation requirements for Type`B"-one-half inch(1/2) <br /> maximum aggregate,coarse or medium gradation as specified in Section 39 of the California Standard Specifications. The bituminous binder to <br /> be mixed with mineral aggregate shall be paving asphalt having(Grade PG 64-10),unless otherwise directed by the Engineer. Placement of <br /> asphalt concrete surfacing shall conform to the applicable provisions of Section 39 of the California Standard Specifications. <br /> 2_ Aggregate Base: Combined mineral aggregates shall conform to the quality and the grading for three-quarter inch(3/4")maximum size <br /> aggregate Class 2 Aggregate Base specified in Section 26:)f the California Standard Specifications. <br /> L Before acceptance of repairs to the County road rights-of-way,all unsightly and detrimental dirt,dust and/or debris shall be removed and the construction <br /> areas left in a neat and presentable condition(s). <br /> 1_ If necessary,County road traveled way and driveway pavements shall-be washed with water to remove dirt and dust <br /> 2. Driveway approaches and field entrance pavements damaged by equipment or spoil banks shall be repaired as directed by the Engineer. <br /> J. Upon request by the County,any settlement,sagging of surface,or cracking of pavement shall be repaired immediately by and at the sole expense of the <br /> Permittee for a period of one year following acceptance of the work <br /> F:\PERMITS COUNTER\genera]provisions\Winter Weather Provisions.docx <br />