Laserfiche WebLink
SPECIAL PROVISIONS <br /> Winter Weather Utility Work <br /> 1. SUPERVISION.: The utility company(perpaittee) shall furnish full-time supervisiori of all work to insure <br /> compliance with the permit provision. <br /> 2. START OF WORD: No work within the County.right-of-way shall be started until the utility company <br /> representative has made an evaluation of weather conditions and has determined the work can be• <br /> Nl accomplished under the provisions of the permit. <br /> 3. CLEAN PAVEMENT: Dirt and mud shall not be deposited on the pavement outside the area of work_, <br /> and if inadvertently tracked onto the road travel way shall be removed immediately. <br /> 4. DAILY RESTORATION: Private driveways.arid road intersections shall be restored daily. <br /> S. WEATHER-TIGHT CONDITIONS: All trenches shall be filled andcompacfed,.ditches and other <br /> drainage facilities regarded and opened, and the entire work area restored to weather-tight condition prior to . <br /> any rain. <br /> FAPERMI?S COUN F-Mgeneral provisions\Winter Weather Provisions.doc <br />