Laserfiche WebLink
NOTES: <br /> 1. If the distance between cross—cuts are less then 150' the entire area between <br /> corss—cuts shall be planed and resurfaced with one (1) inch of Asphalt Concrete. <br /> 2. The resurfacing requirements shall be in addition to County Standard Drawing No. <br /> R-29. <br /> 3. Resurfacing for Bell Holes shall meet these requirements. If excavation occurs within <br /> the shoulder or lane, only that area shall be resufaced as shown. <br /> 4. If cross—cutting is performed on Local Roads at intervals less then 150' a Seal <br /> Coat for that half of the roadway containing the trench can be used in lieu of <br /> resurfacing. Section 2-5.03 (B-2). <br /> -o <br /> Q) <br /> U� U <br /> o jJ <br /> r p <br /> Q <br /> Paved Shoulder--� i X Q <br /> o <br /> w <br /> 0 <br /> T_ <br /> CD_ <br /> o a <br /> 0 <br /> i <br /> N <br /> U 1 W <br /> i I i <br /> V <br /> O <br /> IS/L <br /> O � <br /> 0 U <br /> o <br /> .E o <br /> • TRENCH CUTTING POLICY Approved by: <br /> CROSS CUTTING OF <br /> COUNTY ROADWAYS <br /> No. Revision Description Date <br /> �.► COUNTY OF SAN JOAQUIN <br /> DEPARTMENT OF PUBLIC WORKS <br /> Working for YOU Date: MAY 2015 Std. Dwg. No. R-36 <br />