Laserfiche WebLink
NOTES: <br /> 1 . If the distance between cross-cuts are less then 150' the entire area between <br /> corss—cuts shall be planed and resurfaced with one (1) inch of Asphalt Concrete. <br /> 2. The resurfacing requirements shall be in addition to County Standard Drawing No. <br /> R-29. <br /> 3. Resurfacing for Bell Holes shall meet these requirements. If excavation occurs within <br /> the shoulder or lane, only that area shall be resufaced as shown. <br /> 4. If cross—cutting is performed on Local Roads at intervals less then 150' a Seal <br /> Coat for that half of the roadway containing the trench can be used in lieu of <br /> resurfacing. Section 2-5.03 (B-2). <br /> Q) <br /> o 4, <br /> a� <br /> U�U <br /> O � <br /> Q� O <br /> U) O <br /> c <br /> Paved Shoulder <br /> 0 <br /> o <br /> C Z5 <br /> a_ ° ( O <br /> o_ <br /> C:)_ <br /> L <br /> z' <br /> 0 <br /> V) w <br /> CD_ <br /> o �+, <br /> � <br /> O <br /> E o <br /> L ,A <br /> i J U <br /> TRENCH CUTTING POLICY Approved by: <br /> CROSS CUTTING OF lalj� <br /> COUNTY ROADWAYS No. Revision Description Date <br /> COUNTY OF SAN JOAQUIN <br /> DEPARTMENT OF PUBLIC WORKS <br /> �tll'�CIII� for YOU Date: MAY 2015 Std. Dwg. No. R-36 <br />