Laserfiche WebLink
1 ' <br /> NOTES: <br /> 1. If the distance between cross—cuts are less then 150' the entire area between <br /> corss—cuts shall be planed and resurfaced with one (1) inch of Asphalt Concrete. <br /> 2. The resurfacing requirements shall be in addition to County Standard Drawing No. <br /> R-29. <br /> 3. Resurfacing for Bell Holes shall meet these requirements. If excavation occurs within <br /> the shoulder or lane, only that area shall be resufaced as shown. <br /> 4. If cross—cutting is performed on Local Roads at intervals less then 150' a Seal <br /> Coat for that half of the roadway containing the trench can be used in lieu of <br /> resurfacing. Section 2-5.03 (B-2). <br /> C a) <br /> ° +, <br /> U�U <br /> O O <br /> cU <br /> O <br /> Paved Shoulder—r►� i x Q <br /> a '__ <br /> O <br /> w <br /> O <br /> L <br /> O //// J <br /> i 1 I <br /> 1 <br /> ZI I <br /> N <br /> �I 1 W <br /> I I � <br /> O <br /> 7 <br /> J ' <br /> + O <br /> L .t O <br /> to <br /> E O <br /> I 1 I JU <br /> UM TRENCH CUTTING POLICY Approved by: <br /> CROSS CUTTING OF <br /> COUNTY ROADWAYS NoT Revision Description Date <br /> .. COUNTY OF SAN JOAQUIN <br /> DEPAPTMENT OF PUBLIC WORKS <br /> Working for YOU Date: MAY 2015 Std. Dwg. No. R-36 <br />