Laserfiche WebLink
SPECIAL PROVISION . <br /> Winter Weather Utility Work <br /> 1. <br /> SUPERVISION: The utility company(permittee) shall furnish fullAime supervision of all work to insure <br /> compliance with the permit provision. <br /> 2. START OF WORD: No work within the County.right-of-way shall be started until the utility company <br /> representative has made an evaluation of weather conditions and has determined the work can be <br /> accomplished under the provisions of the permit. <br /> 3� CLEAN PAVEMENT: Dirt and mud shall not be deposited on the pavement outside the area of work, <br /> and if inadvertently tracked onto the road travel way shall be removed immediately. <br /> iveways.arid road intersections shall be restored daily. <br /> 4. DAILY RESTORATION: Private dr <br /> 5. WEATHER-TIGHT CONDITIONS: All.trcnehes shall be,filled and to weacterd, ditches <br /> itc es and other <br /> io prior to <br /> drainage facilities regarded and opened, and the entire work area restored g <br /> any rain. <br /> FAPERMITS COUNTER\general provisions\inter Weather Provisions.docx' <br />