Laserfiche WebLink
NOTES: <br /> 1. If the distance between cross—cuts are less then 150' the entire area between <br /> corss—cuts shall be planed and resurfaced with one (1) inch of Asphalt Concrete. <br /> 2. The resurfacing requirements shall be in addition to County Standard Drawing No. <br /> R-29. <br /> 3. Resurfacing for Bell Holes shall meet these requirements. If excavation occurs within <br /> the shoulder or lane, only that area shall be resufaced as shown. <br /> 4. If cross—cutting is performed on Local Roads at intervals less then 150' a Seal <br /> Coat for that half of the roadway containing the trench can be used in lieu of <br /> resurfacing. Section 2-5.03 (B-2). <br /> � o <br /> a 4-, <br /> �.o <br /> D �U <br /> CO O <br /> � � Q <br /> Paved Shoulder <br /> Q) <br /> o <br /> 6 U <br /> W <br /> O <br /> i <br /> T <br /> 0 <br /> L <br /> z' I <br /> co <br /> co � w <br /> I <br /> CD_ <br /> V J D <br /> ON o4-0 <br /> O <br /> 41 <br /> E o <br /> TRENCH CUTTING POLICY Approved by: <br /> !� CUTTING OF <br /> CROSS AV� <br /> COUNTY ROADWAYS No. Revision Description I Date <br /> COUNTY OF SAN JOAQUIN <br /> DEPARTMENT OF PUBLIC WORKS <br /> WOrldng for YOU Date: MAY 2015 Std. Dwg. No. R-36 <br />