Laserfiche WebLink
NOTES: <br /> 1. If the distance between cross—cuts are less then 150' the entire area between <br /> corss—cuts shall be planed and resurfaced with one (1) inch of Asphalt Concrete. <br /> 2. The resurfacing requirements shall be in addition to County Standard Drawing No. <br /> R-29. <br /> 3. Resurfacing for Bell Holes shall meet these requirements. If excavation occurs within <br /> the shoulder or lane, only that area shall be resufaced as shown. <br /> 4. If cross—cutting is performed on Local Roads at intervals less then 150' a Seal <br /> Coat for that half of the roadway containing the trench can be used in lieu of <br /> resurfacing. Section 2-5.03 (B-2). <br /> c o <br /> o .1 <br /> �� L <br /> C) U <br /> O � <br /> O <br /> � c0 <br /> O O <br /> Paved Shoulder--�� i X Q <br /> o0 <br /> o <br /> a O U <br /> W 1 (D.0 <br /> O <br /> iO <br /> L <br /> 1 1 I <br /> 1 <br /> 41 <br /> zl <br /> 01 i I <br /> V) 1 1 W <br /> I I 1 <br /> O <br /> T� <br /> } .1 <br /> O D <br /> oU <br /> E O <br /> TRENCH CUTTING POLICY Approved by: <br /> CROSS CUTTING OF A41� <br /> COUNTY ROADWAYS No. Revision Description Date <br /> G► COUNTY OF SAN JOAQUIN <br /> DEPARTMENT OF PUBLIC WORKS <br /> Working for YOU Dote: MAY 2015 Std. Dwg. No. R-36 <br />