Laserfiche WebLink
See Note 1 Below <br /> E>;isting <br /> 6" Min- + 6" �Pavemen1 <br /> (�Yp)r � Min <br /> - <br /> (1YP) <br /> \ <br /> 3,-0" \\ \i See Note 2 Below\ Compact in 12" max0" <br /> - \ <br /> layers to a min relative �\ ; <br /> \\ \� compaction of 95% --= <br /> ___-- under pavement and \ -------- \ Var <br /> Var �\ _-- —_ �� 90% outside pavement.. <br /> 00Compact in 24" max OD X12" <br /> \� layers' to a min relative <br /> OD/2 �\ \\ compaction of 85%. \� <br /> • � ��\,�\,�\ �\� Compact in 6„ layers <br /> to a min relative <br /> compaction of 90%. <br /> 10” Min OD - --10" Min 10" Min --OD—n 10" Min <br /> OD <br /> OD <br /> + 20" Min 20 Min <br /> RIGID CONDUIT, ELEXIQLE CONDUIT <br /> NOTES: <br /> 1. New pavement shall be 1" thicker than existing pavement, minimum. <br /> of 0.25 - Ft. 'New base shall be 1" thicker than existing base, min of 0.50 Ft. <br /> 2. Select native material or imported gran-ular material as approved by the Director <br /> of Public Works. Backfill with materials equal to or better than the existing <br /> pavement and base in quality. <br /> 3. Relative compaction of materials shall be tested in accordance with <br /> the- State of California, Dept. of Transportation* Testing Manuals, :test <br /> method No. California 216 or 231. <br /> 4. All existing pavement shall be. neatly cut to line prior to trench excavation. <br /> 5. Jetting or ponding will be permitted within the street right—of—way with <br /> a 3 year bond, when approved by the Director of Public Works. <br /> 6. When shown by soil composition and compact ability, ninety percent (90%) <br /> compaction may be used, when approved by the Director of 'Public Works. <br /> 7: Special bedding and backfill requirements may be shown on the plans or <br /> specified in the speaiai provisions. <br /> Approved by: <br /> C _ TYIRCAL TREK <br /> No. Revision Description TD.t. <br /> COUNTY OF SAN JOAQUIN <br /> Wazi <br /> ni DEPARTMENT OF PUBLIC WORKS <br /> Date: bEC.2014 Std. Dwg. No. R-29 <br />