Laserfiche WebLink
NOTES: <br /> 1. If the distance between cross—cuts are less then 150' the entire area between <br /> corss—cuts shall be planed and resurfaced with one (1) inch of Asphalt Concrete. <br /> 2. The resurfacing requirements shall be in addition to County Standard Drawing No. <br /> R-29. <br /> 3. Resurfacing for Bell Holes shall meet these requirements. If excavation occurs within <br /> the shoulder or lane, only that area shall be resufaced as shown. <br /> 4. If cross—cutting is performed on Local Roads at intervals less then 150' a Seal <br /> Coat for that half of the roadway containing the trench can be used in lieu of <br /> resurfacing. Section 2-5.03 (B-2). <br /> 0 N <br /> a <br /> C) <br /> O C <br /> tU O <br /> CO O <br /> Z: 0_ <br /> Paved Shoulder---�►I i X o Q <br /> U U t-- <br /> a <br /> o <br /> w o <br /> T <br /> o_ <br /> T <br /> o_ <br /> .1 <br /> zo' I <br /> V) I I a <br /> i w <br /> I <br /> T_ <br /> CD_ <br /> C) J� <br /> If--U <br /> O <br /> I O <br /> J U <br /> RM TRENCH CUTTING POLICY Approved by: <br /> CROSS CUTTING OF <br /> COUNTY ROADWAYS No. Revision Description Date <br /> COUNTY OF SAN JOAQUIN <br /> working for YOU DEPARTMENT OF PUBLIC WORKS <br /> Date:MAY 2015 Std. Dwg. No. R-36 <br />