Laserfiche WebLink
NOTES: <br /> 1. If the distance between cross—cuts are less then 150' the entire area between <br /> corss—cuts shall be planed and resurfaced with one (1) inch of Asphalt Concrete. <br /> 2. The resurfacing requirements shall be in addition to County Standard Drawing No. <br /> R-29. <br /> 3. Resurfacing for Bell Holes shall meet these requirements. If excavation occurs within <br /> the shoulder or lane, only that area shall be resufaced as shown. <br /> 4. If cross—cutting is performed on Local Roads at intervals less then 150' a Seal <br /> Coat for that half of the roadway containing the trench can be used in lieu of <br /> resurfacing. Section 2-5.03 (B-2). <br /> 0 N <br /> o 41 <br /> C) <br /> U) O <br /> O,s o <br /> Paved Shoulder— <br /> Q <br /> o <br /> (D 04-- <br /> 0 <br /> w <br /> T <br /> 0 <br /> o_ <br /> i <br /> �I I <br /> ail � <br /> o <br /> z <br /> m <br /> � � w <br /> I <br /> _o <br /> L <br /> } `* U <br /> .L O <br /> U) <br /> I � <br /> E ° <br /> 3 U <br /> TRENCH CUTTING POLICY Approved by: <br /> CROSS CUTTING OF <br /> COUNTY ROADWAYS No. Revision Descri tion Date <br /> COUNTY OF SAN JOAQUIN <br /> worlemg for YOU DEPARTMENT OF PUBLIC WORKS <br /> Date: MAY 2015 Std. Dwg. No. R-36 <br />