My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2015_PS-1502501 thru PS-1503000_ - PS-1502516
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2015
>
PS-1502501 thru PS-1503000
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2015_PS-1502501 thru PS-1503000_ - PS-1502516
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 4:40:07 PM
Creation date
12/31/2015 5:32:34 PM
Metadata
Fields
Template:
Permits_Development
DocName
PS-1502516
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2015\PS-1502501 thru PS-1503000
Year2
2015
Address
W/S ESCALON BELLOTA RD 1.6MI S/O HWY 4
Application
PACIFIC GAS & ELECTRIC -SACRAMENTO
Supplemental fields
APN
PS-1502516
Cross Ref
PWP730052
DocCategory
Permit Applications (PA)
Type (2)
Encroachment Permit (EP)
Tags
Permits_Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SPECIAL PROVISIONS . <br /> Winter Weather Utility Work <br /> 1. SUPERVISION.: The utility compainy(perm*ittee) shall furnish full:-time supervision of all work to insare <br /> compliance with the permit provision. <br /> 2. START OF WORK: No work within the County.right-of-way shall be started until the utility company <br /> representative has made an evaluation of weather conditions and has determined the work can be <br /> accomplished under the provisions of the permit. <br /> 3. CLEAN PAVEMENT: Dirt and mud shall not be deposited on the pavement outside the area of work, <br /> and if inadvertently tracked onto fhe road travel wayshali be removed immediately. <br /> 4. DAILY RESTORATION: Private driveways'and road intersections shall be restored daily. <br /> 5. WEATHER-TIGHT CONDITIONS: All'.trenches shall be filled and compacted, ditches and other <br /> drainage facilities regarded and opened, and the entire work area restored to weather-tight condition prior to . <br /> any rain. <br /> F:IPEPMITS COUNTER\general provisions\Winter Weather Provisions.d= <br />
The URL can be used to link to this page
Your browser does not support the video tag.